Bath in place and boxed in. Tiling still to do. The room look a lot smaller now - almost back to the size it was when we started :) But the bath is 20cm longer and wider than the old one. Something that the kids are looking forward to using.

New radiator mounted but not plumbed in yet.

Work started on the bedroom side of the blocked off door.

The window we're waiting for may delay the fitting of the sink it seems - since it can't be fully mounted until the tiling above is done. Shame that a window takes 6 weeks when you're otherwise on a four week project.

We'll see what happens tomorrow.

Bath and radiator
Bath and radiator
Bath and radiator
Bath and radiator
Bath
Bath
Bedroom side of the blocked off door
Bedroom side of the blocked off door

Latest flickr images

Femsjøen sky
A first test of the Sky-Watcher Star Adventurer tracker head. This shot is made up of 10 shots - each 2 mins at f/2,8 ISO 100 14mm. Merged using Starry Landscape Tracker then adjusted in PS (merged in one shorter exposure at the bottom to get a a sharper land silhouette. You can see that even out of town - still struggling with light pollution - far too much light in the sky. But - still fun to play with.
Langlielva
Langlielva near Elveli
Friends?
Introduction between a norweigan fjord horse and a halfling to see if they could share a paddock. The introduction went well - they now keep each other company in the paddock every day
Evening trees
Mist settling over the trees on a hillside behind a ploughed field